AUSAR ENERGY, an African subsidiary of the ENGIE Group, was awarded a photovoltaic project by the Caisse de Dépôt et de Consignation du GABON: the construction of a hybrid solar power plant. Consisting of solar panels, string inverters and substations, this plant produces 554 MWh per year and supplies 1,586 households.
ENYS POWER Added Value
Our expertise in terms of design and integration, together with the support of our partners, are the criteria that led us to be selected for this pilot project of a hybrid photovoltaic power plant.
We are focused on energy development in off-grid areas of the African continent while protecting the environment. Our commitment and experience earned us our position as one of the players in this project with SAGEMCOM ENERGY & TELECOM.
PRODUCTS
- 5 “HELIOS SSI” substations (for photovoltaic applications with string inverters).